|
Totty Construction
Created by Ian Larnach Associates
<<
Return to Previous Page
Lime Square Apartments, Newcastle - A lightweight steel non-load
bearing fast track solution was required for the internal and external
walls on this four block, 3-4 storey project. Totty Construction
requested the assistance of ILA and we quickly introduced them to Metek
Specialist Building Systems. As a result Metek worked with
Totty’s and their architechts, overcame difficult design issues
and are currently providing supply and fix solutions for both internal
and external walls. We also assisted Totty with specialist
waterproofing solutions. Working with Alderburgh Solution Led Systems,
a specialist supplier of waterproofing, tanking & drainage
solutions we came up with answers to difficult problems and as a result
Alderburgh are currently providing solutions to the concrete podium and
hard landscaped areas.
Related Links: www.metekbuildingsystems.co.uk
| www.alderburgh.com
|
|
|
|
|